Roof Installation & Replacement

Completed roof replacement by Garrison Roofing near Philadelphia

GAF Certified · Most Roofs In 1–2 Days

Roof Installation & Replacement In Philadelphia


When patching stops making sense, you want a roof installed right the first time by a crew that stands behind it. Full tear-off, deck repair, new flashing and ventilation — documented start to finish.

GAF Certified

In-House Crews

1–2 Day Installs

Free Itemized Estimate

Get Your Free Replacement Quote

We’ll tell you honestly if a repair would hold instead.


Free, no-obligation, itemized. We’ll tell you straight what it needs.

Every Roof Reaches The End

Done Right the First Time


At some point every roof reaches the end of the road. The shingles are worn through, the leaks keep coming back, and patching it one more time is just throwing money at a roof that’s done.

We’ve been installing and replacing roofs for over 20 years. A new roof is a big decision and a real investment — so we treat it like one, from the first inspection to the last piece of flashing.

The Honest Part

When You Actually
Need a New Roof


Not every roof that looks rough needs replacing. Sometimes a repair will hold for years. So before we ever quote a full replacement, we inspect the roof and tell you the truth. But if you’re looking at any of these, a replacement is usually the better call.

The roof is 20-plus years old and leaking in more than one place

Widespread granule loss, curling, or shingles cracking across the whole roof

The decking underneath is soft or rotted from long-term water damage

You've patched the same roof three times and it keeps failing

Storm damage that's too extensive to spot-repair

If it were our own roof, that’s the line we’d draw. We’d rather tell you straight than sell you a new roof you don’t need — and we’d rather replace it than keep taking your money on repairs that won’t last. If a repair is the smart move, we’ll say so.

More Than New Shingles

What a Full Roof
Replacement Includes


Every layer matters. Skip one and the roof fails early. We don’t skip any.

01

Tear-Off

We strip the old roof down so we can see and address what’s underneath, instead of layering new material over old problems.

02

Decking Inspection & Repair

We check the wood deck for rot or damage and replace what needs replacing before anything else goes on.

03

Underlayment

A moisture barrier over the decking that protects your home if water ever gets past the shingles.

04

Flashing

New flashing around chimneys, valleys, walls, and vents — because that’s where most roofs leak.

05

Ventilation

Proper intake and exhaust so heat and moisture don’t cook your roof from the inside and shorten its life.

06

New Roofing Material

Installed to GAF standard, cleaned up, and hauled away when we’re done.

Garrison Roofing GAF Certified Residential Roofing Contractor certificate

GAF Certified

Not Just A Badge

GAF-Certified Install,
In-House Crews


Garrison is a GAF Certified Residential Roofing Contractor, which means we’re trained and approved to install to the manufacturer’s spec. That’s what stands behind your manufacturer warranty — and it only holds up if the roof is installed correctly.

Just as important: the crew that installs your roof works for Garrison. No subcontractors. A lot of companies sell you the job and then hand it off to whoever’s cheapest that week. We don’t.

The people who show up are our people, trained the same way, and we back their workmanship ourselves. If something isn’t right, you call us and we fix it. We also bring a certified Spanish-speaking team, so every homeowner gets a clear explanation.

Fits Your Home, Not Our Convenience

Roofs We Install


We install the roof that fits your home, your budget, and how you want it to look — not whatever’s easiest for us.

01

Asphalt Shingle Roofs

The most popular choice for Philadelphia homes: durable, affordable, and available in architectural styles that look great and last.

02

Slate Roofs

The classic look on so many older Philadelphia and rowhome properties, installed by a crew that knows how to work with it.

03

Fiberglass Roofs

A strong, seamless option, especially for rooftop decks and low-slope areas.

04

Low-Slope & Flat Roofs

Membrane systems built for the flat and low-pitch roofs common on Philadelphia rowhomes and additions.

Not sure which is right for your home? That’s part of what the free estimate is for.

Plan Around It

How Long a Roof
Replacement Takes


Most residential roof replacements are a 1 to 2 day job, depending on the size of the roof, the pitch, and the weather. Bigger or more complex roofs take longer, and we’ll tell you up front how long yours should take.

Before we start, we’ll walk you through the whole process: what day we’re coming, how we protect your property, and what to expect while the work is going on. When we’re finished, we clean up thoroughly, magnet-sweep for nails, and haul away every scrap of the old roof.

No Fake Numbers

What a New Roof Costs


We don’t publish a “new roof cost” number, and here’s why: it would be a guess, and a guess doesn’t help you. The price depends on the size of your roof, its pitch, the material you choose, and what we find once the old roof comes off.

What we can promise is a free, itemized, no-obligation estimate based on an actual look at your roof. You’ll see exactly what you’re paying for and why before any work starts — no pressure and no surprises. Many customers get a same-day proposal with photos after the inspection.

Drag The Handle

Full Replacements,
Before and After


Tear-off to finished roof — the whole job, start to done.

Garrison Roofing GAF Certified Residential Roofing Contractor certificate

4.2

Rated 4.2 out of 5 stars.

99 Five-Star Reviews

Across 134 Google reviews · GAF Certified · 20+ years in Philadelphia

GAF ID 1147683

PA #PA057955

Licensed & Insured

OSHA Compliant

No Subcontractors

Straight Answers

Frequently Asked Questions


How long does a roof replacement take?

Most residential roof replacements take 1 to 2 days, depending on the size and pitch of your roof and the weather. Larger or more complicated roofs can take longer. We give you a realistic timeline up front so you’re not left guessing, and we clean up completely before we leave.

What is included in a full roof replacement?

A full replacement means tearing off the old roof, inspecting and repairing the decking underneath, then installing new underlayment, flashing, ventilation, and roofing material to GAF standard. We haul away the old roof and clean up the site when we’re done. Layering new shingles over an old roof isn’t a real replacement, and we don’t do it.

Do I need a permit for a new roof in Philadelphia?

In most cases a roof replacement in Philadelphia requires a permit, and pulling it is part of doing the job correctly. Garrison handles the permitting so you don’t have to chase it down.

What warranty comes with a new roof?

A new roof from Garrison is backed by two things: the manufacturer warranty on the GAF materials, and our own workmanship warranty on the installation. Because we’re GAF certified and use our own in-house crews, both stand behind the roof.

Free & No-Obligation

Get Your Free Roof
Replacement Estimate


Wondering whether your roof has one more repair in it or whether it’s time for a new one? Get a free inspection from a roofer who’ll give you a straight answer, either way.

Get A Free Estimate


Straight prices, in writing — usually within 24 hours.